REAL ESTATE INCLUDED
West Burlington, IA
Utility has confirmed feasibility of scaling to 100 MW, 500MW, and up to 1,000 MW, with a minimum construction timeline of: 100 MW: ~36 months 500–1,000 MW: ~48 months • Further study required for...
$4,500,000